|
Attended Track Geometry
Track Geometry Measurement Using Dedicated Trains
In most countries a record of the track condition is a mandatory requirement. A dedicated measurement train can record and compute not only the required parameters but also other asset condition information. This could include for example structure gauging, OHL condition and conductor rail alignment.
|
|
|
|
Unattended Track Geometry
Track Geometry Measurement Using Service Trains
An asset condition monitoring system fitted to standard passenger trains proving that user with a frequent track measurement service, allowing them to identify growing track faults and intervene accordingly. The user can also monitor the effectiveness of any remedial work and manage the infrastructure in a proactive manner without the need for dedicated measurement trains.
Installations include NIR, London Underground and Queensland Rail.
-
Efficient use of service trains
-
Minimal space requirement
-
Frequent track monitoring
-
Intelligent run synchronisation
-
Predictive and proactive maintenance |